
HalalFund
Crowdfunding platform

MAPNA Group began its activities in the rail transport industry in 1387. In the same year, it began constructing a locomotive engineering and manufacturing plant with the aim of designing, engineering, and manufacturing freight, passenger, and shunting locomotives. Following the launch of the passenger locomotive production line under license from Siemens in 89 and 90, the company's engineering team proposed manufacturing various types of locomotives, and acquiring technical know-how in this field was placed on the agenda during 91 and 92. As a result, six tunnel locomotives were manufactured and put into operation within 18 months. The group's rail transport activities also expanded to metro systems, entering this sector in 1387 by participating in the Mashhad Metro tender, followed by the Qom Monorail tender in 1388. Subsequently, MAPNA participated in Tehran Metro tenders and ultimately signed the contract for implementing Tehran Metro Line 6 in 1395. Currently, MAPNA's focus in the rail sector is on developing the domestic market and using existing capabilities to design and manufacture rail equipment. It is also considering plans to enter foreign markets. This project uses a floating funding model and will be considered successful upon raising at least 60 percent of the amount requested by the project applicant. The project's profit (without a profit guarantee) is projected to be paid from the end of the third month and every 3 months thereafter; the principal will also be repaid at the end of the twelfth month together with the corresponding profit. The principal is guaranteed by the applicant. The SEPAM number of the guarantee issued by the Cooperative Development Bank is 1790404648675989, and it is valid until 1405/05/14 and may be extended at the request of Hesab Yari Amin Melal Company.Project symbol: Halalmapna/ Halalmpa
Project symbol: حلالمپنا/Halalmpa
Company name: MAPNA Locomotive Engineering and Manufacturing Company